Leveling legs, Subbase fuse kit, Subbase power disconnect switch – Carrier Packaged Terminal s & Heat Pumps 52P User Manual
Page 21

21
Leveling Legs
Part No.: LEVELING-LEGS
Leveling legs attach easily to Carrier’s wall sleeve and
offer accurate leveling and support for units without a
subbase. Leveling legs are adjustable from 3
1
/
4
to
5
1
/
2
inches.
Subbase Fuse Kit
Part No.: SUBBASE-FUSE-15A
Part No.: SUBBASE-FUSE-20A
Part No.: SUBBASE-FUSE-30A
The fuse kit provides in-line overcurrent protection at
the unit when required by NEC (National Electric
Code) or local codes.
Subbase Power Disconnect
Switch
Part No.: SUBBASE-SWITCH
The subbase power disconnect 2-pole switch provides
a recessed power disconnect for the PTAC unit when
required by NEC or local codes.
IMPORTANT: The Fuse Kit can only be used with
the electrical or hardwired subbase.
IMPORTANT: This accessory can only be used
with the electrical or hardwired subbase.
Subbase Fuse Kit
ON
Power Disconnect Switch Assembly
Leveling-Legs