Top view frontview, Frontview – Copernicus AUD6-DCS User Manual

Page 12

Advertising
background image

Tip

Wire Management - Routing Cables

Headphone cables run though the side
of the Plastic Top, underneath, come up
through the hole in the center and plug into
the jack box. Excess cable collects in the
Wire Management Rack.

H

H

H

H

H

Note - Plastic Top is shown Transparent
for illustration purposes only

!

Top View

FrontView

H

H

H

FrontView

13

1. Use the iPad mini™ spacer, and set the bottom lip to its minimum position.

Using Dewey with iPad mini™

2. Then slide green piece out to secure iPad Mini™.

Slide the spacer into
the provided slot

Loosen the knob to
slide the bottom lip
into position and then
tighten

1.

2.

3.

1. There is no need for the iPad mini™ spacer, set up the bottom lip to its maximum position.

Using Dewey with 10” iPad®

2. Then slide green piece out to secure iPad®.

1.

2.

3.

Store the spacer under
Dewey’s top mechanism.
Note:
To reposition the spacer,
push up, then slide out.

Loosen the knob to
slide the bottom lip
out and then tighten

AUD5-DCS_AUD6-DCS - Version A - 17 December 2014 - Copernicus Educational Products Inc.

Advertising
This manual is related to the following products: