EFCO S5500 SSG User Manual

Page 10

Advertising
background image

EFCO CORPORATION 6/2012

PART NO. Y554

Series 5500 Silicone Structural Glazed Curtain Wall Installation Instructions

Apply a generous bead of sealant

to the sides of the vertical mullion

where it comes in contact with
the O. G. horizontal.

Work the sealant into the joints

filling all the voids, and tool the

sealant smooth. Make sure the

sealant is cleared from the

grooved area in the front of the

horizontal where the cover will be

engaged.

CAPTURED INTERMEDIATE HORIZONTALS

AT SSG REVEAL JAMBS

Section II: Frame Unit Assembly & Frame Sealing

Advertising