Series 5500 Silicone Structural Glazed Curtain Wall Installation Instructions
Section IV: Glazing Preparation
STEP #2 PREPARE FRAME FOR GLAZING
A. Seal the frame joints at the SSG vertical and captured horizontal intersections. Seal
the 1/4” joint at the glazing pocket. The joint must be sealed from the top all the
way around to the bottom of the glazing pocket, completely filling the joint void.
B. Tool off excess sealant from exposed areas and in areas that would interfere with
installing the horizontal pressure cover.
CAPTURED INTERMEDIATE HORIZONTAL
AT SSG VERTICAL INTERSECTION
1/4” FRAME
JOINT
Seal all around the
joint, filling the void
completely.
CAPTURED IN-
TERMEDIATE
HORIZONTAL
MULLION
FILLER
SSG VERTICAL
MULLION
Note: Joint plugs are not
used in applications where
captured horizontals are
used with SSG verticals. Re-
fer to the tooling drawings
for more information.
Clear any sealant that ob-
structs the reglet for pres-
sure cover engagement.