Step 2), Butt glazed verticals, Fig. 34 – EFCO 904 Series User Manual

Page 35: Fig. 33

Advertising
background image

IN HEAD/SILL CAN

THIS HALF OF

MULLION IS SET

MULLION IS SET

IN HEAD/SILL CAN

FACE TAPE

FIRST.

[FIG. 34]

THIS HALF OF

FIRST.

THIS HALF OF

FIRST.

MULLION IS SET

IN HEAD/SILL CAN

FACE TAPE

DPS 7/2001

SECTION IV C - INSTALLATION

#7256

#7256 MULL HALF MUST BE
INSTALLED BEFORE #7255
MULL HALF.

NOTE:

STEP 2)

pertaining to available degree of corner combinations.

(2) 9563 FOR
90 CORNER
(903 & 904)

Below are butt glazed corner mullion halves for each system

APPLY DOUBLE

(2) 7260 FOR

(901 & 902)

135 CORNER

(901 & 902)

CORNER

for 90

#7255

[FIG. 33]

(903 & 904)

135 CORNER

(2) 9562 F0R

APPLY DOUBLE

SILL CAN

#7255

BUTT GLAZED VERTICALS

Refer to the figures below to determine the related parts.

The butt glazed corners are (2) piece and require the first
half of the corner to be installed and then the other half.

PAGE 33

(cont.)