Fig. 43, Step 4) [fig. 42, Step 3) – EFCO 904 Series User Manual

Page 40: For butt glazed vertical

Advertising
background image

[FIG. 43]

Refer to page 17 for the cut lengths for the butt glazed mullions.

Install the glazing gasket to the interior gasket track as shown below.

on the required center lines. Refer to page 31 to set the mullions.

Cut the can fillers to the correct length to position the vertical mullions

Fill the cavity in the vertical mullion behind the glazing gasket with
silicone sealant, 3/8" above and below the gasket. This should be
done at the head and sill can before the glass units are installed.
See Fig. 43 below.

STEP 4)

[FIG. 42]

BUTT GLAZED

MULLION

FILLER

GASKET RUNS THRU

AT VERTICALS

CAN

STEP 3)

DPS 7/2001

THE GLASS UNITS

THE GLAZING GASKET
AT HEAD & SILL CANS
BEFORE INSTALLING

FILL THIS CAVITY BEHIND

FILLER

JAMB

CAN

JAMB

GLASS STOP

(CONT.)

PAGE 38

FOR BUTT GLAZED VERTICAL

SECTION V A - GLAZING PROCEDURES

CENTER LINE

OF MULLION

CENTER LINE

OF MULLION

Advertising
This manual is related to the following products: