S E R I E S 6 0 0 0 T H E R M A L M U L T I P L A N E I N S T A L L A T I O N M A N U A L

FRAME INSTALLATION

FG-6188 PVC filler

may be used to improve

installation of perimeter

seals (optional)

FG-6430-01

head anchor

NOTES:

1. Anchor size and frequency should be determined by

structural requirements.

2. Sill and head anchors should be located so that the anchor is not more than 4" away from each side of

vertical mullion.

3. Assembly of frames without flashing is not recommended.

4. Assembly of frames using a non-thermal or sheet metal flashing will result in loss of thermal continuity and is

not recommended.

5. Do not anchor frame through the vertical leg of subsill.