S E R I E S 6 0 0 0 T H E R M A L M U L T I P L A N E I N S T A L L A T I O N M A N U A L

FRAME FABRICATION

(SSG Installations)

Measure ROUGH OPENING to determine FRAME WIDTH and FRAME HEIGHT dimensions.

Allow 1/4" min clearance for shimming and caulking at sill and jambs. The head joint requires a min

of 3/8". Reference page 5 for elevation and terminology.

Cut material to size per dimensions given below:

Frame Members:

Subsill or Sill Receptor FRAME WIDTH plus 1/4"

Mullions & Jamb for Std Subsill (see Detail 'A') Overall FRAME HEIGHT minus 3 1/2"

Mullions & Jamb for Low Profile Subsill (see Detail 'B') Overall FRAME HEIGHT minus 3"

Head & Sill FRAME WIDTH

Horizontal Daylight Opening (D.L.O.)

Horizontal Glazing Beads & Fillers D.L.O. minus 1/16"

Accessories:

Head & Sill Exterior Gaskets D.L.O. plus 1" plus 3/8" per foot

Head & Sill Interior Gaskets D.L.O. plus 3/8" per foot

Horizontal Gaskets D.L.O. plus 3/8" per foot

Vertical Gaskets D.L.O. plus 1" plus 3/8" per foot

Other Members (as required):

Horizontal Glazing Adaptors D.L.O. minus 1/16"

Vertical Glazing Adaptors D.L.O. plus 7/8"

Door Jamb ROUGH OPENING minus Head Joint

M

ul

lio

n

H

ei

gh

t

1"

O

ve

ra

ll

FR

A

M

E

H

E

IG

H

T

5/8"

1-1/16"

2"

Subsill Height

Detail 'A'

Standard Subsill

M

ul

lio

n

H

ei

gh

t

1"

O

ve

ra

ll

FR

A

M

E

H

E

IG

H

T

5/8"

1-1/16"

1-1/2"

Subsill Height

Detail 'B'

Low Profile Subsill

(8 PSF Water Max)