29_door_frame – Oldcastle BuildingEnvelope 6000 Series Thermal MultiPlane User Manual

Page 30

Advertising
background image

29






S E R I E S 6 0 0 0 T H E R M A L M U L T I P L A N E I N S T A L L A T I O N M A N U A L

DOOR FRAME INSTALLATION

FG-6156

FG-6163

FG-2145

1"

Run sealant a min

of 1" above back

of subsill

Bed subsill in sealant

at door jamb

Leave front of door jamb clear

of sealant for drainage

NOTES:

1. Use shear blocks as shown in frame assembly section of this manual to secure horizontals to tubular frames

as required.

2. Door frame is anchored by fasteners through threshold and door frame header.

3. When using the center set system, the two-piece or tubular framing options are available as shown above.

When using the front set system only the tubular option is available. The vertical for the front set option is

FG-6287.

FG-2145

Advertising