General-info – Oldcastle BuildingEnvelope Signature Series Unit Wall User Manual

Page 4

Advertising
background image

July 2013

03-General-Info

1-866-Oldcastle (653-2278) www.oldcastlebe.com

PRODUCT USE

The unitized curtain wall system is intended for installation by glazing professionals with appropriate
experience. Subcontractors must be qualified to provide field instruction and project management.

Oldcastle BuildingEnvelope does not control the application of its product configurations, sealant or
glazing material and assumes no responsibility for the application. It is the responsibility of the owner,
architect and installer to make these selections in strict compliance with applicable laws and building
codes.

Consult silicone sealant manufacturer for review and recommendation of sealant application. Follow
sealant manufacturer's recommendations and literature for proper cleaning, testing and application of
silicone sealant.

The air and water performance of the unitized curtain wall is directly related to the completeness and

integrity of the installation process. To ensure top performance for this system, particular attention

should be given to the following procedures:

1. Surface to be sealed should be cleaned with isopropyl alcohol or solvent and dried as

recommended by sealant manufacturer to remove dirt and cutting oils.

2. Vertical movement of mullion at intermediate floors requires special expansion joints and glazing

materials. The system permit maximum +/-3/4" movement. For designs and applications that may
require greater movement or special considerations, please contact your local Oldcastle
BuildingEnvelope facility.

Variations on the details shown may occur, but are not the responsibility of Oldcastle

BuildingEnvelope.

PROTECTION AND STORAGE

Handle all material carefully. Do not drop from the truck, stack with adequate separation so the
material will not rub together. Store material off the ground, protecting against the elements and other

construction hazards by using a well ventilated covering. Remove material from package if wet or
located in a damp area. For further guidelines consult AAMA publication "Care And Handling of

Architectural Aluminum From Shop To Site".

CHECK MATERIAL

Check all material upon arrival at job site for quality and to determine any shipping damage. Using the
contract documents, completely check the surrounding conditions that will receive your materials.
Notify the general contractor by letter of any discrepancies before proceeding with the work. Failure to
do so constitutes acceptance of work by other trades.

GENERAL INFORMATION

SIGNATURE SERIES UNIT WALL INSTALLATION MANUAL

®

®

®