3 aggregate control, 4 cement control, 5 mixer control – Rice Lake CB-2 Concrete Batch Controller Version 2.0 User Manual

Page 63: 6 plant control, 7 water control, 8 admixture control, Aggregate control, Cement control, Mixer control, Plant control

Advertising
background image

Installation/Operation Manual - Front Panel

59

•

Each control includes status lights

9.1.3

Aggregate Control

The CB-2 has an aggregate control panel which includes:

•

Eight single speed or four dual speed fills or up to eight single speed controls

•

Status light on each gate

•

Weigh hopper discharge gate control

•

Aggregate vibrator control

•

Sand bin vibrator control

9.1.4

Cement Control

The CB-2 has a cement control panel which includes:

•

A choice of four cements with dual speed fill or up to eight single speed controls

•

Status lights on each gate

•

Cement bin aeration on four bins

•

Weigh hopper discharge gate control

•

Weigh hopper vibrator control

•

Weigh hopper aeration control

9.1.5

Mixer Control

The CB-2 has a cement control panel which includes:

•

Fully integrated mixer controls

•

Mixer start control

•

Mixer stop control

•

Mixer discharge control

9.1.6

Plant Control

The CB-2 has a plant control panel which includes:

•

Manual override control

•

Status lights

9.1.7

Water Control

The CB-2 has a water control panel which includes:

•

Hot and cold controls with status lights

•

Metered water pulse status light

•

Reservoir discharge control and empty status light

•

Adjustable tail water discharge in either manual or automatic mode

9.1.8

Admixture Control

The CB-2 has a water control panel which includes:

•

Automated and manual control of admixtures

•

Pulse meters including eliminating outboard control

•

Up to six admixtures or colors

•

Fill/fee control and status lights

•

Discharge control and status lights

•

Bottle empty status lights

Advertising