Carrier AQUAZONE 50PSW036-360 User Manual

Page 23

Advertising
background image

CL-1

50PSW

START-UP CHECKLIST

CUSTOMER:___________________________

JOB NAME: _______________________________________

MODEL NO.:___________________________

SERIAL NO.:____________________

DATE:_________

LOOP TYPE: ___________________________

ANTIFREEZE TYPE AND %:_________________________

I. PRE-START-UP

DOES THE UNIT VOLTAGE CORRESPOND WITH THE SUPPLY VOLTAGE AVAILABLE? (Y/N)

HAVE THE POWER AND CONTROL WIRING CONNECTIONS BEEN MADE AND TERMINALS

TIGHT? (Y/N)

HAVE WATER CONNECTIONS BEEN MADE AND IS FLUID AVAILABLE AT HEAT EXCHANGER?

(Y/N)

HAS PUMP BEEN TURNED ON AND ARE ISOLATION VALVES OPEN? (Y/N)

HAS CONDENSATE CONNECTION BEEN MADE AND IS A TRAP INSTALLED? (Y/N)

IS AN AIR FILTER INSTALLED? (Y/N)

II. START-UP

IS FAN OPERATING WHEN COMPRESSOR OPERATES? (Y/N)

IF 3-PHASE SCROLL COMPRESSOR IS PRESENT, VERIFY PROPER ROTATION PER INSTRUCTIONS.

(Y/N)

UNIT VOLTAGE — COOLING OPERATION

PHASE AB VOLTS

PHASE BC VOLTS

PHASE CA VOLTS

(if 3 phase)

(if 3 phase)

PHASE AB AMPS

PHASE BC AMPS

PHASE CA AMPS

(if 3 phase)

(if 3 phase)

CONTROL VOLTAGE

IS CONTROL VOLTAGE ABOVE 21.6 VOLTS? (Y/N)

.

IF NOT, CHECK FOR PROPER TRANSFORMER CONNECTION.

TEMPERATURES

FILL IN THE ANALYSIS CHART ATTACHED.

COAXIAL HEAT

EXCHANGER

COOLING CYCLE:

FLUID IN

C FLUID OUT

C

KPA

FLOW

HEATING CYCLE:

FLUID IN

C FLUID OUT

C

KPA

FLOW

AIR COIL

COOLING CYCLE:

AIR IN

C AIR OUT

C

HEATING CYCLE:

AIR IN

C AIR OUT

C

Advertising