Uc1 universal control connected with an aquastat – Tjernlund HS3,4,5 Series with UC1 Universal Control (Version X.02)  8504111 Rev 09/02 User Manual

Page 12

Advertising
background image

11

UC1 UNIVERSAL CONTROL CONNECTED WITH AN AQUASTAT

XN

R

UNIVERSAL CONTROLLER

LINE VOLTAGE OIL BURNER

PRIMARY CONTROL, BURNER

L1

N

XL

J1

J2

115V

DRY

24V

AQUASTAT

B2

B1

C1

C2

L1

L2

D/N 9183046-7

115 VAC

LEGEND:

CALL
JUMPER

RELAY OR GAS VALVE

50/60 Hz

SUPPLY
115 VAC

RED JUMPER POSITION MUST BE THE SAME

IMPORTANT:

AS APPLIANCE INTERLOCK VOLTAGE.

SPADE TERMINAL IN ELECTRICAL BOX.

GROUND

CRIMP GROUND WIRE TO GROUNDING

IMPORTANT:

CAUTION:

1. Disconnect B1 from L1 of burner relay or hot of gas valve and reconnect to #1 on UC1 terminal block.
2. Connect #2 on UC1 terminal block to B2 or N.
3. Connect #4 on UC1 terminal block to the L1 on line voltage burner relay or gas valve.
4. Make sure RED voltage jumper on UC1 is on 115V.
5. Connect 115 VAC supply voltage to L & N terminals on UC1. Crimp Ground wire to grounding spade terminal in UC1.

Important: Installer must supply overload and disconnect protection.

6. If not completed, connect ground from UC1 whip to Venter ground in Fan Prover j-box. Connect Black & White leads from UC1

whip to Venter motor leads. Connect Blue and Yellow leads from UC1 whip to Fan Prover switch. Prover Leads are not polarity sensitive.

NOTE: If burner control goes out on lockout, the Venter will continue to run as long as a call for heat is present.

UC1 UNIVERSAL CONTROL CONNECTED WITH A SINGLE ZONE 24 VAC THERMOSTAT

XN

R

UNIVERSAL CONTROLLER

THERMOSTAT

G

G

INTERNAL CONTROL

OF FURNACE

W

C

Y

R

R

Y

AS APPLIANCE INTERLOCK VOLTAGE.

RED JUMPER POSITION MUST BE THE SAME

XL

J1

J2

W

DRY

115V

24V

IMPORTANT:

D/N 9183046-5

115 VAC

24 VAC

LEGEND:

CALL
JUMPER

50/60 Hz

SUPPLY
115 VAC

SPADE TERMINAL IN ELECTRICAL BOX.

GROUND

CRIMP GROUND WIRE TO GROUNDING

IMPORTANT:

1. Connect W from t-stat to #1 on terminal block of UC1.
2. Connect #2 on UC1 terminal block to C on internal control terminal strip of furnace/boiler.
3. Connect #4 on UC1 terminal block to W on internal control terminal strip of furnace/boiler.
4. Make sure RED voltage jumper on UC1 is on 24V.
5. Connect 115 VAC supply voltage to L & N terminals on UC1. Crimp Ground wire to grounding spade terminal in UC1.

Important: Installer must supply overload and disconnect protection.

6. If not completed, connect ground from UC1 whip to Venter ground in Fan Prover j-box. Connect Black & White leads from UC1

whip to Venter motor leads. Connect Blue and Yellow leads from UC1 whip to Fan Prover switch. Prover Leads are not polarity sensitive.

LINE VOLTAGE BURNER

RELAY OR GAS VALVE

Advertising