Central station general maintenance – Welch Allyn Connex Central Station - User Manual User Manual
Page 88

Central station general maintenance
General preventive maintenance consists of basic cleaning of equipment, inspection, and
verification of the equipment and system operation. Only a trained biomedical engineer
should perform these tasks.
Perform general preventative maintenance according to the following schedules:
Service activity
Frequency
Component
Action
Cleaning and
maintenance
Annually
CPU
•
Power down the CPU.
•
Open the CPU case and remove any dust
build up.
Display
•
Power down the display.
•
Clean the display and the control buttons.
Keyboard
General cleaning.
Mouse
•
Disassemble the mouse.
•
Remove any dust or debris build up.
•
General cleaning.
Printers
•
Clean external cooling vents.
•
Refer to the printer directions for use for
additional cleaning and maintenance
information.
Note
Use only approved cleaning solutions according to your facility's guidelines
and the manufacturer's recommendations.
82 General maintenance
Welch Allyn Connex
®
Central Station