Single−Piece Installation

The following steps should be followed for the installation of the single−piece

configuration.

1. Remove cover from Equipment Control Module by pressing the two tabs

on the bottom edge and pulling away. Route wires through large hole in

Equipment Control Module. Level Equipment Control Module against

wall (for aesthetic value only − Equipment Control Module need not be

leveled for proper operation) and mark wall through 4 mounting holes.

2. Drill two 3/16−in. mounting holes in wall where marked. Thermidistat

Control may be mounted to a standard junction box if desired. Hole

pattern on Equipment Control Module matches junction box mounting

holes.

3. Secure rear plastic Equipment Control Module to wall with 4 screws and

anchors provided. To avoid unintended bending of wall plate plastic, use

all 4 screws and anchors. Make sure all wires extend through hole in

Equipment Control Module.

4. Adjust length and routing of each wire to reach proper connector block

and terminal on Equipment Control Module with 1/4−in. (6 mm) extra

length. See Fig. 14.