Unit start-up checklist, I. pre-start-up, Ii. start-up – Carrier 48/50PM C16-28 User Manual

Page 188

Advertising
background image

188

UNIT START-UP CHECKLIST

MODEL NO.:

DATE:

______________

SERIAL NO: _____________________________________

TECHNICIAN: ___________________________________

I. PRE-START-UP:

j VERIFY THAT ALL PACKAGING MATERIALS HAVE BEEN REMOVED FROM UNIT
j VERIFY INSTALLATION OF OUTDOOR AIR HOOD
j VERIFY INSTALLATION OF FLUE EXHAUST AND INLET HOOD (48PG and PM ONLY)
j VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
j VERIFY THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT
j VERIFY GAS PRESSURE TO UNIT GAS VALVE IS WITHIN SPECIFIED RANGE (48PG and PM ONLY)
j CHECK GAS PIPING FOR LEAKS (48PG AND 48PM)
j CHECK THAT INDOOR−AIR FILTERS ARE CLEAN AND IN PLACE
j CHECK THAT OUTDOOR AIR INLET SCREENS ARE IN PLACE
j VERIFY THAT UNIT IS LEVEL
j CHECK FAN WHEELS AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND VERIFY SETSCREW IS TIGHT
j VERIFY THAT FAN SHEAVES ARE ALIGNED AND BELTS ARE PROPERLY TENSIONED
j VERIFY THAT SCROLL COMPRESSORS ARE ROTATING IN THE CORRECT DIRECTION
j VERIFY INSTALLATION OF THERMOSTAT/SPACE SENSOR
j VERIFY CONFIGURATION VALUES FOR ELECTRONIC CONTROLS (REFER TO CONTROL SET UP CHECKLIST)
j VERIFY THAT CRANKCASE HEATERS HAVE BEEN ENERGIZED FOR AT LEAST 24 HOURS

II. START-UP

ELECTRICAL

SUPPLY VOLTAGE

L1‐L2

L2‐L3

L3‐L1

COMPRESSOR AMPS — COMPRESSOR A1

L1

L2

L3

  —COMPRESSOR B1

L1

L2

L3

ELECTRIC HEAT AMPS (IF EQUIPPED)L1

L2

L3

SUPPLY FAN AMPS

_______

L1

L2

L3

TEMPERATURES

OUTDOOR‐AIR TEMPERATURE

F DB (Dry Bulb)

RETURN‐AIR TEMPERATURE

F DB

F WB (Wet Bulb)

COOLING SUPPLY AIR

F

GAS HEAT SUPPLY AIR (48PG AND PM )

F

ELECTRIC HEAT SUPPLY AIR (50PG AND PM)

F

PRESSURES

GAS INLET PRESSURE

IN. WG

GAS MANIFOLD PRESSURE

STAGE NO. 1

IN. WG

STAGE NO. 2

IN. WG

REFRIGERANT SUCTION

CIRCUIT A

PSIG

CIRCUIT A Superheat

degF

CIRCUIT B

PSIG

CIRCUIT B Superheat

degF

REFRIGERANT DISCHARGE

CIRCUIT A

PSIG

CIRCUIT A Subcooling

degF

CIRCUIT B

PSIG

CIRCUIT B Subcooling

degF

j VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS

GENERAL

j ECONOMIZER MINIMUM VENT AND CHANGEOVER SETTINGS TO JOB REQUIREMENTS

Copyright 2011 Carrier Corp.

S 7310 W. Morris St. S Indianapolis, IN 46231 Printed in U.S.A. Edition Date: 1/11

Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.

Catalog No:48-50PGPM-03T

Replaces: 48-50PGPM-02T

48/50PG and PM