4 of 4 – Cleveland Range IA-MKDL-60-CC User Manual
Page 30
Advertising
![background image](/manuals/65277/30/background.png)
_______________________________________________________________________
_
DAILY PRE-START UP
4.
The operator must check the kettle, springs and scraper blades for proper
installation before turning kettle on.
5.
Make sure the connecting coupling from the drive shaft to the agitator is
properly installed with the quick release pin fully engaged.
6.
Label and place clean chart on chart recorder.
If the above cannot be achieved, call your maintenance supervisor or service
contractor before proceeding.
Advertising
This manual is related to the following products: