Installation, Installation mounting the unit, Mounting the unit – STIEBEL ELTRON DHC 10-2 User Manual

Page 4: Water connections

Advertising
background image

4

| DHC

WWW.STIEBEL-ELTRON.COM

INSTALLATION

MOuNTING THE uNIT

INSTALLATION

4. Mounting the unit

26

�0

2�

02

�0

33

0

7

6

1

4

3
2

8

5

1 Electrical junction box

2 Water supply line for faucet installation

3 3/8“ compression-T

4 Shut-off valve

5 1/2“ main pipe

6 Sink

7 Cold valve (right)

8 Hot valve (left)

DANGER Electrocution

UNIT MUST BE INSTALLED IN A VERTICAL POSITION WITH

THE WATER FITTINGS POINTING DOWNWARD. DO NOT

INSTALL UNIT WHERE IT WOULD ROUTINELY BE SPLASHED

WITH WATER. ELECTRIC SHOCK MAY RESULT.

1. Install DHC as close as possible to the hot water draw-off

point, for example, directly underneath the sink or next to

the shower stall.

2. Install DHC in a frost free area. If frost may occur, remove

unit before freezing temperatures set in.

3. Leave a minimum of 5“ of clearance on all sides for

servicing.

4. Remove plastic cover.

26

�02

�02

�1

36

0

5. Mount unit securely to wall by putting two screws through

mounting holes. Screws and plastic wall anchors for mount-

ing on masonry or wood are provided.

26

�0

2�

02

�0

33

1

26

�0

2�

02

�1

355

5. Water connections

1. All plumbing work must comply with national and applicable

state and local plumbing codes.

2. A pressure reducing valve must be installed if the cold water

supply pressure exceeds 150 PSI (10 bar).

3. Make certain that the cold water supply line has been flushed

to remove any scale and dirt.

4. Install isolating valve in cold water line as shown in illustra-

tion. This allows the unit to be isolated for maintenance

purposes.

5. Cold water connection (inlet) is on the right side of the unit,

hot water connection (outlet) is on the left side of unit.

Note

EXCESSIVE HEAT FROM SOLDERING ON COPPER PIPES

NEAR THE DHC MAY CAUSE DAMAGE.

Advertising
This manual is related to the following products: