He-110 1b+ ii water wizard water heaters – AERCO Packaged WaterWizard Steam-to-Water Heater User Manual

Page 20

Advertising
background image

HE-110

1B+ II Water Wizard Water Heaters

OMM-0063_0C

Installation, Operation & Maintenance Manual

Page 20 of 50

MC2: 07/26/13

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, New York 10913 • Phone: 800-526-0288

Water Wizard Operating Procedure Instructions (Cont.)

10) The Heater installation is now set for operation. No further operation procedure is

necessary unless or until further temperature control adjustments may be required. If so,
repeat Steps 4, 5, 6, 7, and, if necessary, Step 8.

11) To SHUT DOWN the System:

a) Close all stop valves in the Steam inlet and Condensate outlet lines.

b) In this order, close the stop valves in

i. the hot water outlet line,

ii. the recirculation line, if any, and

iii. the cold water inlet line (see Step 11c, which follows).

c) If the system includes an accumulator or stratified storage tank, DO NOT SHUT OFF

THE COLD WATER UNTIL THE HEATER HAS COOLED DOWN. If the system is
allowed to cool while the cold water is shut off, the Heater liner may collapse
because of formation a vacuum in the Heater.

12) For DRAINING THE HEATER, see the instruction included under ROUTINE

MAINTENANCE, Chapter 6, Section 6.1.

13) To START UP again, with the shell filled per Step 1 above, open the stop valves in the

following order:

1) stop valve in the Cold Water inlet line,

2) any stop valve in the recirculation line, if any,

3) stop valve in the Hot Water outlet line, and

4) stop valves in the Steam inlet line and Condensate outlet lines.

14) After each startup, check the temperature control. If necessary, make adjustments per

Steps 4 through 9.

Advertising