Preparation of coil gaskets, 1b+ ii water wizard water heaters he-110 – AERCO Packaged WaterWizard Steam-to-Water Heater User Manual

Page 37

Advertising
background image

1B+ II Water Wizard Water Heaters

HE-110

Installation, Operation & Maintenance Manual

OMM-0063_0C

MC2: 07/26/13 Page 37 of 50

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, New York 10913 • Phone: 800-526-0288

TOP VIEW

1/8" MINIMUM

1/8" TO 1/4"

1/8" TO 1/4"

SIDE VIEW

1/8" MINIMUM

Figure 15: Coil Assembly Spacing

10.11. PREPARATION OF COIL GASKETS

Two 6-tab gaskets are provided with each replacement Coil Assembly. Proceed as
follows:







Figure 16: Coil Gasket Preparation

2 - 3°

Preparation of Coil Gaskets

1) Form the Gasket into a round shape

2) Using Needle-Nose Pliers, form the 6 tabs on each Coil Gasket by bending each tab outward

2 to 3 degrees as shown in Figure 16. This will secure the Gasket into the Spud’s inside
diameter.

Advertising