Preparing to remove the heater shell, He-110 1b+ ii water wizard water heaters – AERCO Packaged WaterWizard Steam-to-Water Heater User Manual

Page 32

Advertising
background image

HE-110

1B+ II Water Wizard Water Heaters

OMM-0063_0C

Installation, Operation & Maintenance Manual

Page 32 of 50

MC2: 07/26/13

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, New York 10913 • Phone: 800-526-0288

10.5. PREPARING TO REMOVE THE HEATER SHELL

Note that all part item numbers are given in parentheses ( ) in the instructions below refer to
those shown in Figures 14, 15, 16, 17, or 18.

Also, Note that it is not necessary to disassemble or remove the Check valve Assembly (see
above) in order to remove the Heater Shell.








































Figure 12: Part Reference for Heater Shell Removal


Preparation for Heater Shell Removal Instructions

1. Shut down and drain the Heater in accordance with Steps 1 through 4 in ROUTINE

MAINTENANCE, Chapter 6.

2. If a self-contained Control Valve is being used, remove the Valve’s Temperature Control

Thermal Element from the Thermal Well Bushing (62) in the Heater Top Head. Be careful not
to damage the Element or its capillary.

3. Disconnect ALL external piping from the Heater Top Head, including that to the Relief Valve(s)

(67) and the Water Solenoid Valve (73). Disconnect the Hot Water outlet piping at the union or
flange located beyond the outside diameter of the Heater Top Head.

4. Disconnect the power supply wiring to the Control Box and all wiring between the Control Box

and any outside Solenoid Valve(s).

5. Disconnect the Pressure Gage pressure line Compression Fitting (60).

6. Disconnect the Compression Fitting (59), located at the bottom of the Shunt Tubing (69) from

the Heater Bottom Head.

Advertising