14. operating features – Fluke 2180A User Manual
Page 18
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
Advertising

2-13. Prepare the 2180A for operation by plugging the
input line power cord into the applicable power source or
connecting the external input connector to an external
12V dc source.
2180A
2-15. The location of the 2180A controls, indicators,
and connectors is shown and described in Figure 2-1 and
Table 2-1 respectively.
2-14. OPERATING FEATURES
Figure 2-1. Controls, Indicators and Connectors
2-2
Advertising