Level adjlustment, Notes before starting .operation – Toshiba TEC SL59 SERIES User Manual

Page 12

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

E1-041B9

9. LEVEL ADJLUSTMENT

Set the scale on a stable and level surface.
Level the scale by turing the adjustable legs so that the air bubble is

inside the center circle.

Level Gauge

When the air bubble moves toward the left side,

turn the right adjustable legs clockwise.

Correct

When the air bubble moves toward rear,
turn the front adjustable legs clockwise.

Incorrect

10.NOTES BEFORE STARTING .OPERATION

(1) Be sure to insert the power plug into AC outlet.

(2) When the power plug is connected to the AC outlet, thè scale goes through the test scanning

sequence, such as 00000,00000,000000, then 11111, 11111, 111111 •■■and zeros appear on the

weight and total price displays. When the control lock is turned from OFF to REG over 16 seconds

after the power plug is connected to the AC outlet, all “8”s appear on all displayd, there by

completing the test scanning sequence.

(3) While scale is in the test sequence, do not put anything on the platter.

(4) Do not move the unit while it is in operation. Should it become necessary ot move it at any time, turn

the control lock to OFF poosition and be sure to redjust the level indicator after relocating the scale.

(5) Should a power failure occur during operation, remove the commodity from the platter and insert the

power plug into AC outlet again when power is restored.

(6) If scale is used with an unrated power source, inaccurate scaling or other errors may occur.

(7) If Zero Point has shifted during scaling, and no tare is displayed, adjust Zero Point by depressing

Zero switch.

11 -

Advertising