Radiance direct vent gas heater – Vermont Casting RADVTCB User Manual

Page 39

Advertising
background image

39

Radiance Direct Vent Gas Heater

20012697

Burner Orifice Conversion
1. Remove three (3) 3/8” nuts on bottom side of burner

pan. (Fig. 72)

2. Carefully remove ember bed by tilting the right side

up and lifting out toward the right side of the unit.
(Fig. 73)

CO144

RF Pilot conversion

6/07 djt

Pilot

Orifice

CO1044

Fig. 71 Remove pilot orifice.

�����
�����������
����

Remove Nuts

Remove Nut

Bottom View

Fig. 72 Remove three (3) nuts securing ember bed in place.

ST918

3. Remove injector orifice from left burner bracket with

a 1/2” wrench. Use a back up wrench to prevent
damage to the manifold. (Fig. 74)

�����
��������������
����

Pem Studs

ST919

Fig. 73 Tilt ember bed slightly to correctly place on venturi
and air shutter.

Orifice
Bracket

Venturi Bracket

������
����������������
����

Orifice
Bracket

Orifice

Air Shutter

CO142

Fig. 75 The air shutter setting is 1/2” (13 mm) from the orifice
bracket to the edge of the air shutter.

4. Install conversion orifice. (Refer to Table 2)
5. The air shutter is factory set according to Table 3

and should not need adjustment. The air shutter
opening may be verified by measuring as shown in
Figure 75.

�����
��������������
����

CO145

Fig. 74 Use two wrenches to avoid damage to manifold.

All Models
1. Replace burner making sure venturi on bottom of

ember bed aligns with orifice and is seated properly
on air shutter assembly. (Fig. 73) Make sure burner
is slid into place at a slight angle and opposite to
how it was removed. When burner is slid into place,
the three (3) pem studs should slide down through
clearance holes into the bottom of the control panel.

2. Thread and tighten 3/8” nuts back onto pem studs

on underneath side of control panel, reversing Step
1 shown in Figure 72.

3. Reinstall logs as per instructions on Page 26.
4. Place conversion label on valve.

Advertising
This manual is related to the following products: