Maxitrol M511 and

M611 Low Fire

Bypass Screw

Mod Valve Voltage Summary

Volts DC

Firing Mode

0 to 5 VDC

Low Fire

5 to 15 VDC

Modulation

15 to 20 VDC

High Fire

Maxitrol MR212

Low Fire

Bypass Screw

Average Man ifold Pressu re vs. Firin g Rate/Ft. of Burn er

-1.00

0.00

1.00

2.00

3.00

4.00

5.00

6.00

0

100000

200000

300000

400000

500000

600000

Firing Rate (BTU/Hr/Ft. of Burner)

M

a

n

if

o

ld

P

re

s

s

u

re

(

in

.

w

.c

.)

Natural Gas

Propane Gas

Main Burner Adjustment

1. Once the pilot has been properly established, the

manifold gas pressure or temperature rise should be
adjusted to jobsite conditions. The gas pressure
regulator (integral to the combination gas control on size
1-3 heaters and located in the modulating valve on size
4-5 heaters) is adjusted at the factory for average gas
conditions. It is important that the gas be supplied to the burner in accordance with the input
rating on the rating plate.

2. Create a high fire call for heat. This should be done with the blower on and all gas controls on.

High fire can be achieved by removing the wire at terminal #4 (remove wires #2 and #4 for
Maxitrol 44 systems) from the Maxitrol 14 amplifier.

3. The manifold pressure should be checked

at the pressure tap downstream of the
modulating valve. The graph to the right
indicates the proper manifold pressure for
the desired amount of BTUs per foot of
burner. For natural gas systems, the high
fire manifold pressure should not exceed 5
in. w.c. For propane gas, the high fire
manifold pressure should not exceed 2.5
in. w.c. Another method of checking high
fire is to measure the temperature rise of
the unit. The temperature rise should be
set to design conditions and typically is
minimum 70°F.

4. Remove the cap from the combination gas

valve regulator adjustment (size 1-3) or
the cap from the MR212 valve (size 4-5).
Using the regulator pressure adjusting screw, adjust the high fire manifold pressure to 5 in. w.c.
maximum for natural gas and 2.5 in. w.c. maximum for propane gas. High fire should be set to
generate the desired temperature rise. If the high fire screw is at the end of its adjustment and
more pressure is needed, then adjust the main building gas pressure regulator spring (located
external to the unit) to achieve the proper manifold pressure. Turning the regulator screw
clockwise will increase pressure and counter-clockwise will decrease pressure. Remember -
The high fire DC voltage should read 12 VDC minimum and should typically be 15 VDC on
the Flame Safety Controller test jacks.

5. Reconnect the wire on the Maxitrol 14 amplifier at terminal #4 (wires #2 and #4 for

Maxitrol 44).

6. The low fire manifold pressure must now be set. Low fire can be achieved by

removing the wire at terminal #5 from the Maxitrol 14 amplifier (remove #8 for
Maxitrol 44). Check the low fire flame signal to ensure that the DC voltage is 12
VDC minimum on the Flame Safety Controller test jacks.

7. Using the bypass screw (located on the side of the M511 and M611 valves, and

under the cap of the MR212 valve), adjust low the low fire manifold pressure until
there is a very thin flame along the entire length of the burner. No dark spot should
be seen in the burner. The burner may be observed through the view-port located
on the external wall of the heater. Replace the cap to the Maxitrol valve and restore
all of the original wiring on the Maxitrol amplifier and gas components.

8. A final gas leak check shall be performed to verify the gas-tightness of the heater’s

components and piping under normal operating conditions. This can be done by
measuring the gas pressure at the ¼” gas plug just downstream of the modulating
valve.