Chapter 3: installation, Preparing needed tools – Avaya C360 User Manual

Page 35

Advertising
background image

Issue 1 July 2006

35

Chapter 3: Installation

The C360 switch is ready to work after you complete the installation instructions described in
this chapter. After you have completed the procedures in this chapter, proceed to

Chapter 4: Powering Up the Avaya C360

The following steps are described in this chapter:

●

Preparing Needed Tools

●

Site Preparation

●

Rack Mounting (Optional)

●

Wall Mounting (Optional)

●

Stacking (optional)

●

Making Connections to Network Equipment

●

Installing SFP GBIC Transceivers

Preparing Needed Tools

Prepare the tools you need to mount the Replace variable w/ short product name, according to
the

Table 5

:

Table 5: Mounting Tools

If you need to mount on...

Prepare these tools

Rack or wall

Phillips head screwdriver

Flat wall

screws to fasten Replace variable w/ short
product name to the wall

Uneven wall

●

16.3" x 18.3" (415 x 465 mm) plywood
board 0.8" (20 mm) thick
wood screws

●

screws to fasten the Replace variable w/
short product name to the wall

Advertising