Maintenance, Monthly inspections, Six month maintenance – Cleveland Range MKDL-125-CC User Manual

Page 34: Yearly maintenance, Inspection and maintenance check list, Item inspection, Warranty

Advertising
background image

31

MAINTENANCE

INSPECTION AND MAINTENANCE CHECK LIST

Cleveland Range equipment requires little preventative maintenance. We do however provide the following
chart as a guide line for inspection and maintenance to keep your unit functioning at 100%.

MONTHLY INSPECTIONS

Item

Inspection

Item Switches

Inspect switches for damage and correct operation. Replace as required.

Product Drain Valves

Tangent Draw-Off Valve

Inspect parts for damage. Test valve for leakage. Replace as required.

Butterfly Valve.

Inspect parts for damage. Test valve for leakage. Replace as required.

Air Valve

Inspect parts for damage. Test valve for leakage. Check valve seals for air
leakage. Inspect supply hose and fittings. Replace as required. Inspect air
filter and replace if required.

SIX MONTH MAINTENANCE

Lubrication

Grease trunnion housings.

Grease bridge swivel assembly.

Use "Never Seize" on tilt worm and gear.

Strainers

Clean strainers in steam in and cooling water supply lines.

YEARLY MAINTENANCE

Lubrication

Drain hydraulic oil and remove filter. Replace oil and filter (see Hydraulic
Oil Replacement Procedure.

Solenoid Valves

Inspect solenoid valves for proper operation. Clean or replace as required.

WARRANTY

Our Company supports a worldwide network of Maintenance and Repair Centers. Contact your nearest

Maintenance and Repair Centre for replacement parts, service, or information regarding the proper
maintenance and repair of your cooking equipment

In order to preserve the various agency safety certification (UL, NSF, ASME/Ntl. Bd., etc.), only factory-

supplied replacement parts should be used. The use of other than factory supplied replacement parts will
void warranty.

Advertising
This manual is related to the following products: