MF Digital Director EC Publishing Series User Manual

Page 14

Advertising
background image

DIRECTOR EC Series Operator’s Guide

Document Revision: 080904

Page 13

1. With a Torx head

screwdriver, remove the
rubber feet from the
bottom of the printer (fig.
1).

2. Using the flat head screws

provided, attach the
printer plate to the bottom
of the printer as seen in
(fig. 2).

NOTE: Fig 3 – Fig 5 shows placement of
Spectrum 2 printer. Placement for Prism
Plus is similar.

3. Place the printer / plate

onto the drive bay (fig. 3)

4. Use the dotted line at the

rear of the drive bay to
guide the positioning of
the printer on the drive
tower (fig. 4)

5. After placing the printer

on the drive tower, use the
“Printer Alignment”
function to align the
printer. Please refer to p.
30 for details.

6. Once you are satisfied

with the printer
alignment, tighten the
thumb-screws located on
both sides of the printer
(fig. 5).

(fig. 2)

(fig. 1)

(fig. 3)

(fig. 4)

(fig. 5)

Advertising