INSTALLATION (CONTINUED)

P

LATFORM

I

NSTALLATION

The SSI2 and SSI2-2 come with a flat non-stick platform for low speed operation with common
vessels, including trays and dishes. To install an optional platform the user must:

Unscrew the four aluminum, platform thumb screws from the corners of the internal
platform and remove the green rubber mat.

Clean any dirt or debris from the metal base-platform and apply the desired optional
platform so that the four corner holes are aligned.

Screw in the four aluminum, platform thumb screws tightly by hand.



P

OWER

S

OURCE

Always position the unit so the end-user has access to the power plug.

Check the data plate for voltage and ampere requirements before making a connection. If the
requirements match your power source, plug the power cord into an earth grounded outlet.
Supplied voltage must not vary more than 10% from the data plate rating. Damage to the
incubator may result if supplied voltage varies more than 10%.

These incubators are intended for a 50/60 Hz application. Use a separate circuit to prevent loss of
product due to overloading or circuit failure.

Note: Electrical supply to the incubator must conform to all national and local electrical codes.

C

LEANING

The incubator interior was cleaned at the factory but not sterilized. See the

Cleaning

topic in the

User Maintenance section for more information.