Special tramlining rhythms – TeeJet LH INTELLITRAM 500 User Manual

Page 29

Advertising
background image

LH ”I

NTELLITRAM

” 500 O

PERATORS MANUAL

T

RAMLINING RHYTHMS

LH A

GRO

29

Rhythm 18 left/right:
Shut off = right side, start the field on the left-hand side.

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18


Shut off = left side, start the field on the right-hand side.

18

17

16

15

14

13

12

11

10

09

08

07

06

05

04

03

02

01

SPECIAL TRAMLINING RHYTHMS

Rhythm 28 Left:
3 metre seed drill/28 metre cultivating equipment.
Shut off = 2 x right & 1 x -left side, start the field on the left-hand side.

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28


Rhythm 28 Right:
3 metre seed drill/28 metre cultivating equipment.
Shut off = 1 x right & 2 x left side, start the field on the right-hand side.

28

27

26

25

24

23

22

21

20

19

18

17

16

15

14

13

12

11

10

09

08

07

06

05

04

03

02

01

Advertising