9.6. Prepare Cables

9.6.1. Allow minimum 10 ft of slack cable to route into FDH (site dependent) excess to be cut off.
9.6.2. Remove jacket and armor 2” within entry point.
9.6.3. Secure drop and feeder cables to provided “T” clamps using zip-ties or hose clamps as

appropriate.

9.6.4. Excess cable should be pre-measures and allow enough slack to reach work area and be stored

neatly in FHD, cut to length needed for configuration.














9.7. Patch

9.7.1. Install each MDU home run drop cable to rear patch panel, label as required.
9.7.2. Install pre-terminated trunks or field install feeder cables front of patch panel, inactive fibers

stored in parking lot.

9.7.3. Dress, route and secure feeder & MDU drops to provided cable management clips