Phase iii, Installation - piping – TriangleTube TR Series User Manual

Page 16

Advertising
background image

Phase III

®

•

Recommended for applications in which there is a

large water consumption in short period of time.

•

A maximum of 3 water heaters may be piped in series.

•

Utilize the lead (hot water outlet) Phase III

®

tank ther-

mostat to control system temperature.

•

Install automatic mixing valve at either the hot water
outlet of the water heater system or at each hot water
fixture.

•

Each tank should be piped with a drain as shown in
Fig. 1.

13

Installation - Piping

Circulator

Recirculated

Water

Automatic

Mixing Valve

Hot Water

Outlet

Cold Water

Inlet

T&P

Relief

Valve

Cold Water

Inlet

Isolation

Valve

Circulator

Automatic

Mixing Valve

Hot Water

Outlet

Cold Water

Inlet

T&P

Relief

Valve

Cold Water

Inlet

Isolation

Valve

Recirculated

Water

Multiple TR Series Water Heater System
Domestic Piping - Parallel

Multiple TR Series Water Heater System
Domestic Piping - Series

•

Recommended for most applications.

•

Any one water heater tank thermostat may be uti-
lized to control system temperature.

•

Install automatic mixing valve at either the hot

water outlet of the water heater system or at each

hot water fixture.

•

Each tank should be piped with a drain as shown in

Fig. 1.

Fig. 8:

Fig. 9:

Advertising
This manual is related to the following products: