Use and operation, Notes on operation, Connecting and starting operation – VACUUBRAND MPT 200 User Manual

Page 9: Notice

Advertising
background image

page 9 of 22

Documents are only to be used and distributed completely and unchanged. It is strictly the users´ responsibility to check carefully

the validity of this document with respect to his product. Manual-no.: 999226 // 05/05/2014

Use and operation

Notes on operation

Gas

Correction factor cold cathode

Correction factor Pirani

Air / N

2

-

1.00

CO

2

0.74

0.89

H

2

2.39

0.58

He

5.93

1.02

Ne

3.50

-

Ar

0.80

1.59

Kr

0.60

-

Xe

0.41

-

The vacuum gauge head MPT 100 / MPT 200 consists of two components: one cold cathode sensor and

one Pirani sensor. The pressure measurement is dependent on the gas type. The vacuum gauge head

is factory-set for operation with air / N

2

.

Use the following correction factors when working with other gases in the pressure range below 0.1

mbar:

Connecting and starting operation

Vacuum connection:

Remove the protective cover and keep.

Connect the vacuum gauge head via small flange to the vacuum application.

The vacuum gauge head may be mounted in any orientation, though an orienta-

tion in which condensate cannot get into the measuring chamber is to be pre-

ferred.

Avoid contamination (oil/oil mist) of the measurement chamber when generating the vacuum with an

oil-filled vacuum pump.

Do not mount the vacuum gauge head directly at the oil-sealed pump. Use only vacuum lines with a

sufficient diameter.

Inside a vacuum system the vacuum might not be uniform (e.g., in case of evaporation). Therefore

choose carefully the position where to connect the vacuum gauge head.

Condensate and deposits in the measuring chamber falsify the measurement result.

Soiling and damage affect the function of the vacuum gauge head.

If residues occur or when working with aggressive or condensable substances, install a gas washing

bottle in front of the vacuum gauge head MPT 100 / MPT 200.

Electrical connection / VACUU•BUS

Voltage supply and readout of the vacuum gauge head via VACUU•BUS line by the vacuum gauge

DCP 3000. Maximum cable length inside buildings: 30m. Extension cable VACUU•BUS 2m: order-no.

612552.

NOTICE

Advertising
This manual is related to the following products: