Lp tank sizing, Ng/lp fuel conversion – Winco ULPSS20B4W/A User Manual

Page 8

Advertising
background image

20-00

8

60706-228

Shown below is a diagram of a natural gas (NG)

installation.

Reference numbers 2 through 4 in the diagram

above are system parts supplied by the customer.

Reference number 4 is on the generator.

Below are tables of the fuel pressure readings at

each reference in the system.

FUEL PRESSURE TABLES

Single Low Pressure Regulator (LP Vapor only)

REF #

1

3

4

UNIT OFF

LINE PSI

7-11 IN

4-6 OZ

7-11 IN

4-6 OZ

STARTING

LINE PSI

7-11 IN

4-6 OZ

7-11 IN

4-6 OZ

NO LOAD

LINE PSI

7-11 IN

4-6 OZ

7-11 IN

4-6 OZ

FULL

LOAD

LINE PSI

7-11 IN

4-6 OZ

7-11 IN

4-6 OZ

Two (2) Regulator System (LP Vapor only)

REF #

1

2

3

4

UNIT

OFF

LINE PSI

10-15

LBS

7-11 IN

4-6 OZ

7-11 IN

4-6 OZ

START-

ING

LINE PSI

10-15

LBS

7-11 IN

4-6 OZ

7-11 IN

4-6 OZ

NO

LOAD

LINE PSI

10-15

LBS

7-11 IN

4-6 OZ

7-11 IN

4-6 OZ

FULL

LOAD

LINE PSI

10-15

LBS

7-11 IN

4-6 OZ

7-11 IN

4-6 OZ

Natural Gas

REF #

2

3

4

UNIT OFF

2 PSI

7-11 IN

4-6 OZ

7-11 IN

4-6 OZ

STARTING

2 PSI

7-11 IN

4-6 OZ

7-11 IN

4-6 OZ

NO LOAD

2 PSI

7-11 IN

4-6 OZ

7-11 IN

4-6 OZ

FULL

LOAD

2 PSI

7-11 IN

4-6 OZ

7-11 IN

4-6 OZ

LP TANK SIZING

Required LP tank size for LP Vapor withdrawal

operating at various outside temperatures given in

degrees Fahrenheit (Celsius).

TANK TEMPERATURE

TANK SIZE

60° F (16° C)

150 GALLON

32° F (0° C)

250 GALLON

0° F (18° C)

500 GALLON

-20° F (-29° C)

1000 GALLON

NG/LP FUEL CONVERSION

These generator sets are factory tested on Natural

Gas and will require no modifications for normal

operation on Natural Gas. The carburetion system

has been preset and anti-tamper plugs have been

installed in the carburetor as required by the EPA.

To make a fuel conversion you will have to first

remove the left side door. Looking down to your left

you will see a decal and a plug. Remove the plastic

plug with a screwdriver. Using a 5mm or 3/6” hex

allen wrench turn

LEFT about /4 turn until you feel

a click and it will stop turning.

No other modifications to the unit are necessary. To

switch from LP to NG you turn the selector to the

right (NG) position.

Advertising