Fig. 16 — Suction Line Piping — Row-Split Coil

DRILL a SCREW

PAN TO COVER SHEET

DRILL § HOLE

FOR TUBE IN
COIL COVER SHEET

HUMIDIFIERS — Humidifier water and steam

supply must be odor-free and uncontaminated.

Consideration shall be taken by installer as to
corrosive and odor effect from hard or contami­

nated water. Carrier assumes no responsibility for
problems caused by inadequate water treatment.

General — It is recommended that a strainer be
installed in supply line. Steam grid humidifiers
require a drain line trap with a water seal to offset
unit negative static pressure. Trap is similar to that

shown in Fig. 19.

f

CONDENSATE

PAN

Fig. 17 — Expansion Valve Condensate Pan

CHILLED WATER, HOT WATER AND STEAM
COILS

1. Use unions or flanged coil connections for ease

of service per Fig. 18.

2. Install a tee with a pipe plug at coil connection

to facilitate air blow thru coil for freeze
protection per Fig. 18.

CONDENSATE DRAIN - Connect drain line and
trap per Fig. 19 to condensate drain connection.
Do not reduce pipe size. Run drain line to nearest

open site drain. On unit sizes 070 thru 140, install
a field-supplied cap on unused drain connection.

Fig. 18 — Coil Connections