INSTALLATION CHECK LIST

LOCATION AND SUPPORT

COMPARTMENT

GASOLINE FUEL SYSTEM

EXHAUST SYSTEM

DATE OF INSTALLATION

NAME OF INSTALLER

ELECTRICAL CONNECTIONS

___1. The NP generator is properly located.

___2. The generator is properly supported.

___3. The generator is properly restrained.

___1. Compartment construction is proper.

___2. Holes/openings are vapor-sealed.

___3. Compartment size is correct.

___4. Compartment is vapor-sealed.

___5. Sound insulation is O.K.

___6. Floor cutouts properly completed.

COOLING and VENTILATING AIR

___1. Air flow is adequate.

___2. Air inlet opening is correct.

___3. Compensate for restrictions

4. Installation has been tested

___1. Comply with code requirements.

___2. Junction box properly installed.

___3. Wiring meets all standards.

___4. All connections are correct.

___5. Conduit properly installed and sealed.

___6. Generator properly bonded to vehicle.

BATTERY INSTALLATION

___1. Recommended battery is installed.

___2. Recommended cables are installed.

___3. Cables are clean and tight.

___4. Cables are properly connected.

___5. Proper ventilation is provided.

POST INSTALLATION TESTS

.1. All tests properly completed.

OPTIONS AND ACCESSORIES

___1. Fuel tank complies with code.

___2. Fuel system properly installed.

___3. Fuel system checked for leaks.

Check that remote start/stop panels (if used) are
properly installed.

If an hourmeter kit is installed, check that job was

done properly.

If any other options and accessories are installed,

check that they were installed properly.

_1. Complies with code requirements.

_2. Properly and safely installed.

SIGNATURE OF INSTALLER