INSTALLATION CHECK LIST

LOCATION AND SUPPORT

___1. The generator is properly located.

___2. The generator is properly supported.

___3. The generator is properly restrained.

COMPARTMENT

___1. Compartment construction is proper.

___2. Holes/openings are vapor-sealed.

___3. Compartment size is correct.

___4. Compartment is vapor-sealed.

___5. Sound insulation is O.K.

___6. Floor cutouts property completed.

COOLING and VENTILATING AIR

_1. Air flow is adequate.

_2. Air inlet opening is correct.

_3. Compensate for restrictions

4. Installation has been tested

GASOLINE FUEL SYSTEM

___1. Fuel tank complies with code.

___2. Fuel system properly installed.

OPTIONAL PROPANE GAS SYSTEM

___1. System is properly installed.

___2. Correct pressure at regulator inlet.

___3. Rated flow of primary regulator is O.K.

___4. All parts are properly installed.

___5. System was properly tested for leaks.

___6. System properly tested/adjusted.

ELECTRICAL CONNECTIONS____________

___1. Comply with code requirements.

___2. Junction box properly installed.

___3. Wiring meets all standards.

___4. All connections are correct.

___5. Conduit properly installed and sealed.

___6. Generator properly bonded to vehicle.

BATTERY INSTALLATION_____________

___1. Recommended battery is installed.

___2. Recommended cables are installed.

___3. Cables are clean and tight.

___4. Cables are properly connected.

___5. Proper ventilation is provided.

EXHAUST SYSTEM

POST INSTALLATION TESTS

___1. Complies with code requirements.

___2. Properly and safely installed.

___1. All tests properly completed.