3 installation – ADLINK ND-6510 User Manual

Page 30

Advertising
background image

26

NuDAM-6510

3.3 Installation

Software Utility

Software is not necessary.

Equipments for Installation

A 2-wire RS-485 network or 4-wire RS-422 network.

DC Power supply (+10V~+30V)

Wires

Installation Procedure

1. Make sure the original RS-422/RS-485 network is power off.

2. Wire the power supply to NuDAM-6510. Note that the power supply should

meet the specification.

3. Wire other NuDAMs to the extend RS-485 bus.

Advertising