3 installation – ADLINK ND-6510 User Manual
Page 30
Advertising
26
• NuDAM-6510
3.3 Installation
Software Utility
Software is not necessary.
Equipments for Installation
A 2-wire RS-485 network or 4-wire RS-422 network.
DC Power supply (+10V~+30V)
Wires
Installation Procedure
1. Make sure the original RS-422/RS-485 network is power off.
2. Wire the power supply to NuDAM-6510. Note that the power supply should
meet the specification.
3. Wire other NuDAMs to the extend RS-485 bus.
Advertising