Water connection, Commissioning, Installation – Bonaire Durango Window Cooler User Manual

Page 11

Advertising
background image

B

ONAIRE

D

URANGO

W

INDOW

C

OOLER

Installation

Use the two ‘Wallmate’ screws provided to fix the cooler to the outside of the house if a
‘stucco-type’ wall is being used. (Note that if the unit is not hard up against the wall,
these fixing screws will go into the spacer block all ready installed).

For solid walls, brick or masonry, use suitable masonry lag anchors.

Place the unit in position, mark screw positions, remove unit then drill pilot holes for
timber walls (1/8” or 3.2mm).

Replace unit in window, fit screws.

Water Connection

Fit mains water supply line to the float valve installed. The float valve connection is ½”
BSP.

Note: Water connection line to float valve must be flushed before connecting.

The overflow is factory fitted. The bleed hose protruding through the overflow fitting
SHOULD bleed water during normal operation at a rate between 6 – 12 Litres per hour.
This is normal and is designed to preserve the quality of the Cooler and Cooling efficiency
of the Unit. If required this Bleed water can be plumbed away using standard 'over-the-
counter' garden hose and fittings.

The float valve is factory set and should require no further adjustment at time of installation
(see page 13 if adjustment is required).

Your cooler is now ready for commissioning.

Commissioning

Check that another door or window in the room is open to allow air to exhaust to other
parts of the house.

Turn the water supply to the cooler on.

Plug the cooler into a 240V 50Hz sing

le phase grounded appliance socket on the inside of

mode, check that a constant small stream of bleed off water

ow tube. This bleed off is designed to reduce mineral build up on

ilter pads. This is

normal during the commissioning phase and at the beginning of each season when the
unit is operated after the winter break. It will only last for a short time.

the house and switch the socket on.

Turn the unit on to FAN mode and check the operation of the three speed fan.

Rotate the control knob to COOL mode and operate the three speed fan and pump.

Leaving the unit in the COOL
is coming from the overfl

®

the CELdek filter pads.

You may notice a wet paper smell as the water circulates around the f

Page 11

WEAC628

Advertising