Dillon Precision Square Deal 'B' User Manual

Page 7

Advertising
background image

Ready? Let’s Set Up

Carefully remove your new Square Deal “B” from its

packaging. Set the small parts aside.

Fig. 1 – Install the ejected cartridge chute bracket

(#13659) with two large screws (#13976) from the parts

bag.

Fig. 2 – Using the machine itself as a template, mark

the three mounting holes. Allow about one foot on both

sides of your Square Deal “B” for working room. Make

sure your bench is sturdy and does not shake, as this may

disturb your powder charge and primer system.

Fig. 3 – Drill the mounting holes and secure the

Square Deal “B” to your bench, using 1/4" bolts (not

supplied).

Fig. 4 – Install the spent primer cup/return bracket

(#17212) on the bottom of the shaft (#13437). The spent

primer cup (#16211) simply slides onto the rails of the

bracket.

Fig. 3

Fig. 4

7

Fig. 1

16211

17212

Fig. 2

May 2007 Square Deal B Manual 5/17/07 2:23 PM Page 7

Advertising