Dillon Precision Square Deal 'B' User Manual

Page 9

Advertising
background image

Fig. 10 – The powder measure is held in place by the

collar clamp (#13986). Tighten in place, but do not over

tighten.

Fig. 11 & 12 – Installation of the Powder Measure

Failsafe System.

To install the failsafe rod (#16814) remove the blue

stripper wingnut (#13799), rod spring (#14033) and

washer (#18086). (Note the order of parts.) See Fig. 11

Insert the bottom end of the rod between the bench

and the Square Deal “B” through the hole in the return

bracket (#13355). Then, using your thumb and index

finger of your right hand, move the lock-link (#17838)

down to align the hole with the slot on the Powder

Measure bellcrank (#17839). Next, insert the failsafe rod

(#16814) through the two holes and insert the failsafe rod

clip (#13840).

Install the washer (#14033) and the wingnut (#13799).

With your left hand, move the operating handle (#20114)

to the priming position; press the operating handle firmly

forward and with your right hand adjust the wingnut until

the spring is partially compressed. You are now ready to

reload. Refer to the rear view in Fig. 11 to assist in the rod

location and proper powder measure positioning.

Check It Out

Your assembly should now be complete, but before

you stock it with powder and primers let’s run through the

operation a few times.

Your Square Deal “B” has been adjusted at the factory

in the caliber of your choice and we’ve enclosed the

sample rounds that we used to obtain those adjustments.

One cartridge has a bullet seated to illustrate the seating

depth and the other round was primed (the primer is

inert).

Place the cartridge case without the bullet in Station 1

Fig. 11

Fig. 12

Fig. 10

9

May 2007 Square Deal B Manual 5/17/07 2:23 PM Page 9

Advertising