Powering the lift and remote control – Display Devices MFD-100 Microphone Table Lift User Manual

Page 4

Advertising
background image

IP024-027 RevA

MFD-100 Lift Series Installation

4/3/2007



7.)

Before installing the MFD in your table, ensure that the top surface is level. If manual level

adjustment is required, unscrew the clamp collar using a 7/64” Allen wrench, adjust the plate until it
is level, and retighten the clamp collar. The location of the clamp collar is shown below.

Figure D

8.)

If you have installed wood coverings on the MFD, it is recommended that you wire and test the

rotation before installing it in your table in case any additional modifications are necessary. See the
next section for information about powering the unit and using the included remote control. Make
sure that the wood surfaces are not impeding the rotation before continuing to the next step.

9.)

Line up the top plate of the MFD with the cutout in the table. Once it’s aligned properly, attach the

unit to the underside of the table by threading four wood screws through the holes in the side flaps.
Exercise caution when attaching the screws so they don’t protrude through the top of the table. It is
recommended that you work with your mill worker while performing this step to insure a seamless
installation.

Powering the Lift and Remote Control



Attaching the three-button control and powering the lift:

Pin1: ‘Home’ button (BLACK)

Pin 2: ‘Show’ button (RED)

Pin 3: ‘Stop’ button (GREEN)

Pin 4: Ground for control cable

Pin 5: Power ground

Pin 6: Positive Power, 24V DC


When the MFD-100 is receiving power, the red LED light on the inside circuit board will blink.

1 2 3 4 5 6

Advertising