Operation, Rt80q operator’s manual – Ditch Witch RT80 User Manual
Page 116
Advertising
RT80Q Operator’s Manual
Backhoe - 115
Operation
CMW
Operation
Use boom/swing control and bucket/dipper control to dig hole or trench.
•
Keep dipper and boom at right angles as much as
possible for maximum power.
•
Keep bucket in line with dipper as much as
possible.
•
Position bucket so teeth cut soil. As soil is cut, curl
bucket under dipper.
•
Move dipper and bucket together. Increasing
engine speed will not increase backhoe force.
IMPORTANT: For more information about backhoe controls, see page 56.
Advertising