Multiple boiler guide, 1 - multiple boiler operation – Dunkirk Helix VLT Vertical Laser Tube, Wall Hung Modulating Condensing Boiler User Manual

Page 2

Advertising
background image

2

MULTIPLE BOILER GUIDE

1 - Multiple Boiler Operation

System Setup
• Boiler control can be applied for multiple boiler systems in cascade setup.
• System sensor input is available on low voltage terminal block to measure cascade system supply temperature.
• CH & DHW pump outputs are available on managing boiler.
• When CH supply temperature is calculated based on outdoor sensor, only one outdoor sensor is needed. Sensor is

connected to managing boiler and calculates CH setpoint for cascade system.

• In case of cascade in combination with domestic hot water tank DHW pump can be connected to pump output of

managing boiler control. Thermostat must be wired to managing boiler.

Cascade boiler pump connections
System confi guration for handling DHW store or central heating demand. All boilers handle either DHW storage

or CH heating demand at one time.

Figure 1 - Typical Multiple Boiler Piping

3/8"/10mm Open End

Wrench

DHW

Pump

CH/System

Pump

12"/305mm Maximum Separation

System

Temperature

Sensor

Size common piping

per maximum heat

capacity of entire

system

All internal

primary loop

ball valves

closed

Limit length

to 5' (1.6m)

Advertising