Adjustments, Depth regulator lever, Belt tension adjustment – EarthQuake 3200 User Manual

Page 12

Advertising
background image

12

ARDISAM

DEPTH REGULATOR LEVER

Tilling depth is controlled by the height of the depth
regulator lever.

To adjust tilling depth.

1. Remove detent pin.

2. Raise the depth regulator lever to position tines at

chosen tilling depth.

3. Align hole in depth regulator lever with hole in depth

regulator bracket and replace detent pin.

Do not adjust tilling depth unless drive safety control
lever is released to the neutral position.

BELT TENSION ADJUSTMENT

Proper belt tension is critical to good performance. After
1/2 hour of operation, all cables may have to be adjusted
due to initial stretch. Thereafter, check tension after every
2 hours of operation.

To increase belt tension:

1. Loosen upper jam nut. Turn nut up cable in 1/8"

increments.

2. Tighten lower jam nut.

3. Check adjustment.

This procedure can be repeated until conduit adjustment
bolts have no more adjustment left. If no more adjustment
can be made, belt may have to be replaced.

ADJUSTMENTS

depth

regulator

lever

detent pin

forward cable

upper jam nut

lower jam nut

1/4”

stretch

CAUTION

Advertising