Unpacking and assembly, Unpack tiller – EarthQuake 3200 User Manual

Page 9

Advertising
background image

9

ARDISAM

UNPACKING AND ASSEMBLY

UNPACK TILLER

1. Open top of carton and remove handlebar assembly.

2. Find parts packet. Parts packet contains:

6- 5/16-18 x 1-3/4” bolts
6- 5/16” spring lockwashers
2- hand knobs
4- locknuts
2- 1/2” push nuts
1- detent pin

3. Cut open end of carton and remove machine:

a. Install wheels on each end of axle, tap on push nuts

with a hammer.

b. Assemble tines to unit, inside tines first. Sharp edge

of tine will be away from operator at top or face down
at front of machine.

c. Outside tines have two positions- wide 21” & narrow

16”. For narrow width - assemble with short side of
tine holder pipe towards center of machine.

d. For wide width - move left tine to right side and right

to left side. Assemble with long half of tine pipe
towards machine.

e. Slide top handle of handlebar over lower loop. Put

5/16-18 x 1-3/4” bolts thru both holes from inside
out, put on 5/16” spring lockwashers and tighten with
hand knobs.

f. Check upper and lower jam nuts for tightness. See

page 12, Belt Tension Adjustment.

g. Add and check engine oil.

The right and left sides of your
rototiller are determined from
the operating position as you
face the direction of forward
travel.

Narrow Tine Width

Wide Tine Width

hand knob

lower

handlebar

loop

upper

handlebar

Do not try to lift the rototiller from the carton.

CAUTION

Advertising