5 domestic hot water system, 6 installation preparation – Glow-worm sxi and Gas Valve User Manual

Page 17

Advertising
background image

17

0020015347-03

6.1 Appliance Pack

IMPORTANT: With regards to the Health and Safety Manual
Handling requirements, two persons shall be required to lift the
appliance, refer to manual handling on page 5.

Please check the boiler carton contents as shown in diagrams
6.1 and 6.1a.

NOTE: The fittings pack, pipe pack and document pack are
located in the polystyrene packing on the top of the boiler.The
flexible condensate outlet pipe is located in the base polystyrene
packing under the boiler base.

Remove the polystyrene end packing pieces then carefully lay
the boiler on its back, remove the two front casing panel
securing screws and lift off the panel from two retaining lugs.

Remove the transit packaging behind the front panel and
discard.

Carefully place front panel and screws to one side.

12892

5.1 General

General - All domestic hot water circuits, connections, fittings
must be in accordance with the relevant standards and water
supply regulations.

For GB: Guidance G17 to G24 and recommendation R17 to
R24 of the Water Regulations Guide.

For IE: The current edition of I.S.813 "Domestic Gas Installations".

The domestic water hot service must be in accordance with the
current issue of BS5546, refer also to the current issue of
BS6700.

5.2 Domestic Hot Water Cylinder

SINGLE FEED INDIRECT CYLINDERS ARE NOT SUITABLE
AND SHOULD NOT BE USED.

The domestic hot water cylinder must be of the double feed
indirect coil type. It must be suitable for working at a gauge
pressure of 0.35bar above the safety valve setting.

5 Domestic Hot Water System

Diagram 6.1

6 Installation Preparation

FIXING JIG