12 servicing, Attention! 12. 6 combustion check – Glow-worm sxi and Gas Valve User Manual

Page 34

Advertising
background image

34

0020015347-03

Diagram 12.8

12899

Diagram 12.9

DRAIN POINT

DRAIN
VALVE

GAS SERVICE
COCK

MOUNTING JIG

FIXING
JIG

CENTRAL
HEATING
RETURN
FILTER

RETAINING
CLIP

HOUSING

Diagram 12.10

10063

SEAL

FRONT
CASING
PANEL

FLAT
AND
HOLE

INNER
CASING
PANEL

12898

12 Servicing

12.7 Central Heating Return Filter

Turn off the electrical supply to the boiler.

Refer to section12.8 and drain the heating circuit of the boiler.

Remove the filter retaining clip and clean filter or renew if
necessary, see diagram 12.8.

Refit the filter, ensuring the correct orientation. The flat and hole
in the filter positioned as shown in diagram 12.8. Secure with
retaining clip.

Open the heating flow and return isolating valves and refill, vent
and pressurise the heating circuit. See section 11.2.

Check for leaks.

12.8 Draining of Boiler Heating Circuit

Drain down the Heating Circuit only, by closing the heating flow
and return isolating valves on the wall mounting jig, see diagram
7.1.

Attach a length of hose to the drain point and open the drain
valve, see diagram 12.9.

After servicing or replacing parts, close the drain valve and
remove the hose. Open the heating flow and return isolating
valves and refill, vent and pressurise the heating circuit. See
section 11.2.

Check for leaks.

12.9 Inner Casing Panel Seal Check

Check the condition of the seal, replace as required.

To replace remove the old seal, thoroughly clean the casing
sufaces. Fit the new seal, it is supplied to the correct length, see
diagram 12.10.

ATTENTION! 12. 6 COMBUSTION CHECK

When carrying out a combustion check or
replacing the gas valve, please click this link to
go to the gas valve replacement instructions
for the gas valve setting procedure.

Advertising