Maintenance, Combustion chamber and heat exchanger, 5 inner casing panel seal check – Glow-worm Ultracom hxi User Manual

Page 30: 6 service completion

Advertising
background image

0020107233_00 - 06/11 - Glow-worm

MAINTENANCE

- 30 -

Gently remove the fan, gas valve and burner assembly from

the combustion chamber.

Clean the burner with a soft brush taking great care not to

damage the front insulation. DO NOT use wire or sharp

instruments to clean the holes of the burner.

Inspect the burner for any signs of damage.

Remove and discard the burner door seal and replace with

new, see diagram 11.7.

11.4. Combustion Chamber and Heat

exchanger

Remove loose debris from inside the combustion chamber

using a soft brush and vacuum cleaner.

Carefully flush by spraying water into the heat exchanger, any

remaining debris should pass through the condensate trap

(Ensure the water is kept away from electrical components).

11.5 Inner Casing Panel Seal check

Check the condition of the seal, if worn or damaged remove

the seal and thoroughly clean the casing surface before fitting

the new seal, see diagram 11.8.

Refit the inner casing panel.

noTe: Ensure the seal is fitted correctly giving an airtight

joint.

11.6 Service Completion

Re-check the combustion as described at the beginning of

this section.

On completion of the service the “Benchmark” Service Record

should be completed.

13864

BURNER

GAS PIPE BRACKET

AND SEAL

GAS VALVE

FAN

NYLOC SECURING

NUTS (5 OFF)

COMBUSTION

CHAMBER

SECTION THROUGH

BURNER DOOR SHOWING

POSITION OF SEAL

SEAL

Diagram 11.7

13272

Diagram 11.8

Advertising