Lamar Technologies BETA D-50 User Manual

Page 9

Advertising
background image

3. QUICK OPERATING GUIDE

F.

VIEW AND SET CUTOFF VOLTAGE

a. Press and hold the View Voltage Cutoff button. The set cutoff voltage

is shown on the voltmeter display.

b. Use a 1/16 inch (2 mm) slot blade precision
type screw driver to adjust the cutoff voltage
to the desired level.

G.

PUSH START BUTTON

The audible alarm stops. The voltmeter displays the battery
voltage, the ammeter reads 0 and the timer starts. The red
LED on the timer illuminates. “OP” on the timer illuminates
and the red LED flashes.

H.

SET DISCHARGE CURRENT

Slowly turn the multi-turn Ampere Adjust knob clockwise to
the desired discharge current. The ammeter displays the
current as it is being adjusted.


I.

WAIT FOR THE DISCHARGE TEST TO

AUTOMATICALLY COMPLETE

During the test the battery voltage, discharge current, and
elapsed discharge time are displayed. The voltage will
continuously decrease while the current remains constant. The
test completes when either the set discharge time or the low
cutoff voltage has been reached. An audible alarm sounds and
the displays freeze at their final values.

J.

1. IF TEST PASSED

The green Accept lamp illuminates. This indicates the discharge
has continued through the duration of the set discharge time (the
red LED and “OP” on timer is off.) without the cutoff voltage being
reached. The battery is usually fit for service, after complete
recharge. See below under respective battery type.

BETA D-50 TESTER / ANALYZER - OPERATING MANUAL V2.2

Page 7


Advertising